Production Process

Manufacturing Facility

Factory Aerial View

Administration

Scrap Yard

15000 Sqft. scrap yard with scrap preheating facility where the scrap is segregated and sorted as per their grades.

Melting Furnace & VD

Two Electric Melting Furnaces collectively melting capacity of 90 MT within 24 Hours with latest temperature measuring instruments.

Ingot Casting / Cooling Pit

After Refining, Ingots are casted in pit by bottom pouring ladle in variety of cast iron ingot Moulds which are available in more than 30 different sizes and shapes.

Testing Facility

We have fully equipped chemical and mechanical testing facility to ensures highest quality standards.

Storage Area

6000 Sqft. area is available for the storage of Ingots, Continuous Cast Billets / Blooms, Rolled and Forged Bars where we retest and ensure 100 % radiation free material is dispatched